PrimeWater

PrimeWater takes control of Bacolod water operation

The Villar Group’s PrimeWater Infrastructure Inc. will invest a total of P1.6 billion to improve the water supply system in Bacolod City during the first five years of its 25-year joint venture agreement with the Bacolod City Water District.          

READ MORE »
Share on facebook
Facebook
Share on twitter
Twitter
Share on email
Email
MORE STORIES

‘Catharsis of Creativity’ opened at Gallerie G

• CHRYSEE G. SAMILLANO Twenty Negrense artists opened a group art exhibition titled “Catharsis of Creativity” at Gallerie G, Villa Geronca Building, Rosario-Amapola streets, Bacolod City on April 13, which will run for a month. Guest of honor at the

Photo of the Day

ASSISTANCE. A member of the Amity Volunteer Fire Brigade helps deliver water, using water tankers and fire hoses, to the community at Purok Masagana, Barangay Alijis, Bacolod City.*

Politics not Albee’s priorities right now – spox

• CHRYSEE G. SAMILLANO Bacolod Mayor Alfredo Abelardo Benitez’s priority is to deliver his commitments of projects to Bacolod made during the last election, before his term ends, and solve the pressing problems currently experienced by all Bacolodnons like the

PDP eyes challenging Lacson in 2025 elections

• GILBERT P. BAYORAN The Partido Demokratiko Pilipino, led by former President Rodrigo Roa Duterte, is eyeing the fielding of a gubernatorial bet for Negros Occidental in the 2025 elections, if there is clamor to replace Governor Eugenio Jose Lacson,

PDP Laban members in Victorias resign

• GILBERT P. BAYORAN The ongoing consolidation efforts of Partido Demokratiko Pilipino Lakas ng Bayan in Negros Occidental suffered a setback after its members in Victorias City resigned from the political party, following its plans to challenge incumbent Gov. Eugenio

PrimeWater-BACIWA address El Niño with water infra

• GILBERT P. BAYORAN PrimeWater, together with Bacolod City Water District (BACIWA), recently held a groundbreaking ceremony for their upcoming water source interconnection, pipe laying project, and source activation. These initiatives are expected to significantly improve water pressure and availability